How to conduct a pre-demolition audit
The purpose of a pre-demolition audit is to identify materials and components (hazardous and non-hazardous, reusable and non-reusable) that will result from demolition activities. The inventory should include estimated quantities of materials, qualitative information and management/recovery options.
A pre-demolition audit includes the following steps:
- Desktop study
- Field survey (on-site visit with optional laboratory testing)
- Preparation of Inventory (assessment of collected data)
- Management/recovery recommendations
- Reporting
A pre-demolition audit should be conducted by a qualified pre-demolition auditing expert in collaboration with building owners and contractors responsible for waste management.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Listed structures on the rail network
Heritage interests and operational requirements must be balanced.
Historic England publishes research into embodied carbon when retrofitting traditional buildings.
New Prime Minister delivers on ECA call for cut in electricity costs.
CIOB reacts to the announcement of Andy Burnham as Prime Minister.
Heritage and conservation science workforce survey - Have your say.
England's Suburbs 1820-2020. Book review.
New, more proportionate and targeted approach for higher-risk building assessments.
Government brings British Steel into public ownership.
UKCW Birmingham returns with bold new theme and focus.
New guidance published on competence requirements for self-certification schemes.
Construction Management, 8 July
NEETs crisis drives interest in trades, but apprenticeships barriers remain.
Passive fire protection webinar
MEP services penetration seals.