How to conduct a pre-demolition audit
The purpose of a pre-demolition audit is to identify materials and components (hazardous and non-hazardous, reusable and non-reusable) that will result from demolition activities. The inventory should include estimated quantities of materials, qualitative information and management/recovery options.
A pre-demolition audit includes the following steps:
- Desktop study
- Field survey (on-site visit with optional laboratory testing)
- Preparation of Inventory (assessment of collected data)
- Management/recovery recommendations
- Reporting
A pre-demolition audit should be conducted by a qualified pre-demolition auditing expert in collaboration with building owners and contractors responsible for waste management.
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Households living near new pylons to save on bills.
ECA warns growth must not outpace grid capacity or skills.
The role of the client and decision making
CIOB response to built environment professions call for evidence.
Construction's sustainability reporting revolution
Tracking upfront embodied carbon with digital tools.
ECA welcomes procurement reforms
Public spending must back British jobs and skills.
Campaigning for Edinburgh: the Cockburn Association 1875-2049
The role of the civic voice in protecting character. Book review.
CIOB photography competition is open for entries.
ECA Edmundson apprentice of the year award
Finalists announced.
Major new study exposes serious knowledge gaps.
Generating energy from internal light as well as sunshine.
ECA welcomes plans to strengthen subcontractor quality control.
Combining mid-career qualifications with experience broadens career opportunities.

















